Docs/handbook/parallel agents and worktrees

Parallel Agents and Git Worktrees

Handbook: Run several coding agents at once without merge chaos
Repo anchors: parallel-implementer.agent.md · kit scripts/aies-worktree.mjs · kit plans/_TASK_CONTRACT.md
Version: 1.0 | Updated: 2026-11-06


Purpose

Define the one correct way to run multiple AI coding agents concurrently on one repository: one task, one branch, one worktree, one base commit, bounded by a written task contract and merged serially by a human.

Why

Every major agent runtime now runs agents in parallel — Claude Code subagents with isolation: worktree, Cursor Cloud Agents, Copilot cloud agent, Codex cloud tasks, and local multi-session setups. Throughput goes up; so does a new class of failure that sequential AI coding never had:

Failure Cause What prevents it
Agents overwrite each other's edits Shared working directory One worktree per agent
Clean git merge, broken build Semantic conflict across tasks Dependency-ordered serial merge + re-verify after each merge
Flaky tests, "port already in use" Shared ports, DB, caches Per-worktree port range + DB schema
Agent "fixes" files outside its task No boundary Task contract with Allowed paths, checked mechanically
Rework after review Tasks were not independent Split only along file/ownership seams; overlap check before starting
Review queue collapse 10 agents, 1 reviewer Cap at 2–4 concurrent agents per human reviewer

The bottleneck in parallel agent work is human review and integration, not generation. The process below is designed around that bottleneck.

How

1. Decide whether to parallelize at all

Parallelize only when the approved plan splits into tasks that (a) touch disjoint files, (b) have independently verifiable acceptance criteria, and (c) are each larger than ~30 minutes of agent work. Otherwise run one agent sequentially — coordination overhead exceeds the gain.

2. Write a task contract per task

The contract (kit: plans/_TASK_CONTRACT.md) is the agent's entire mandate. Required sections:

Section Rule
Objective One observable outcome; link the parent plan
Allowed paths Globs; anything else is a violation
Prohibited paths Lockfiles, CI config, migrations unless the task is that
Acceptance criteria Each verifiable by a command
Isolation Ports, DB schema, credentials for this worktree
Dependencies Tasks that must merge first
Stop conditions Out-of-bounds need, plan conflict, repeated failure, budget
Budget Wall clock, turns/tool calls, spend

3. Create isolated worktrees

node scripts/aies-worktree.mjs new JIRA-42-api --base main
node scripts/aies-worktree.mjs new JIRA-42-ui  --base main
node scripts/aies-worktree.mjs overlap          # before starting: expect no shared files

The helper creates agent/<task> from a recorded base SHA in ../<repo>.worktrees/<task>, writes .env.worktree (PORT, AIES_PORT_RANGE, DATABASE_SCHEMA), and copies the contract template. Worktrees sit outside the main checkout so IDE indexers and file watchers in the main window do not pick them up.

Runtime-native equivalents follow the same rule:

Runtime Native isolation Note
Claude Code Subagent frontmatter isolation: worktree Kit's parallel-implementer sets it
Cursor Cloud Agents (each on its own branch) or a local worktree per window One agent per branch
GitHub Copilot Cloud agent works on its own branch, opens a draft PR Environment from copilot-setup-steps.yml
Codex Cloud tasks in isolated containers; local CLI per worktree [agents] max_concurrent_threads_per_session caps fan-out

4. Run agents with the contract attached

Start one agent session per worktree (or delegate to parallel-implementer). Attach the contract and the parent plan. The agent stops — it does not push, open PRs, or merge.

5. Gate and merge serially

  1. node scripts/aies-worktree.mjs check <task> — every changed file inside Allowed paths.
  2. Human reviews the self-review (reviews/<task>-code-review.md) and the diff.
  3. Merge the task that others depend on first.
  4. Rebase remaining branches onto the new main; re-run their verify commands. A clean rebase is not proof — semantic conflicts surface only in tests.
  5. Repeat. remove each worktree after its PR merges.

Tradeoffs

Choice Gain Cost
Worktree per agent No working-copy collisions; parallel builds Disk + install time per worktree (mitigate with package-manager caches)
Strict contracts Mechanical scope enforcement Up-front planning time; legitimate cross-cutting fixes need a plan amendment
Serial merge Semantic conflicts caught one at a time Wall-clock integration is sequential
2–4 agent cap Review keeps up Leaves theoretical throughput unused

Anti-patterns

  • Parallelizing an unsplit plan. "Agent A does backend, agent B does frontend" without an agreed API contract produces two incompatible halves. Freeze the interface first, as its own task.
  • Shared branch, multiple agents. Commits interleave and each agent's context goes stale. One agent per branch, always.
  • Merging because git said "no conflicts". Clean textual merges routinely break builds. Re-verify after every merge.
  • Letting agents decide fan-out. An agent spawning agents spawning agents explodes cost and review load. Fan-out is a human (or orchestrator) decision made from the dependency graph.
  • Shared dev database. Two agents' integration tests mutate the same rows; failures look random. Per-worktree schema or container.

Enterprise considerations

  • Audit: record base SHA, contract hash, agent runtime, and model in each PR description; regulators ask "what instructions produced this change?"
  • Credentials: worktrees get sandbox or read-only credentials only; production secrets never enter an agent environment.
  • Capacity: set an org cap on concurrent cloud agents per repository; cost and review load scale linearly.
  • Policy as code: run the path-boundary check in CI against the contract committed on the branch, so the gate holds even for cloud agents you do not control locally.

Checklist

  • Plan approved and split along disjoint file seams
  • One filled contract per task; overlap check shows no shared files
  • One worktree + branch per agent from a recorded base SHA
  • Ports and DB schema isolated per worktree
  • ≤ 4 concurrent agents per reviewing human
  • Boundary check + self-review before human review
  • Serial merge in dependency order; verify after each merge

Changelog

  • 2026-11-06: Initial chapter — task contracts, worktree isolation, runtime-native isolation map, serial merge protocol.